Project Details

Completion Date: August 2014

Location: Tulare Valley, California

Client: Consolidated Edison Development (CED)

The site spans over 140 acres and will produce enough power to serve roughly 16,000 homes annually.

White River 2 Solar project is a 26.6MWDC solar photovoltaic, grid connected power generation facility. This project was completed in 10 months.

Ryan’s responsibilities comprised full engineering, procurement and construction of the entire system including procurement of electrical equipment, preparation of the site involving management of all project grading and trenching. Ryan also installed the support structures, module racking system, modules, inverters, DC wiring, AC power cables, with the associated collection equipment and all electrical systems for the entire project involving module connections and inverter installation. The Ryan team designed and optimized the project processes, installation and the 34.5kV-11.5Kv substation.

Project Overview
  • ATI’s ground-mount single-axis tracking support structure on impact-driven steel piers
  • PLAs with IBEW and Ironworkers
  • Quanta successfully managed and worked around Swainson Hawk nesting zones during construction
  • Yingli 300W polycrystalline modules
  • GE Brilliance 1.05MW inverters
  • Constructed for Consolidated Edison Development (CED)
  • All power sold to Pacific Gas & Electric (PG&E)
  • Quanta Subsidiaries involved:
    • Dashiell Corporation
    • Intermountain Electric, Inc.

Related Projects

2017
ConEdison Development 150MW Portfolio

The ConEdison Development Portfolio represents a combined 150MW at six different locations in the Central Valley of California. Some 1000 acres will have been converted...

View Project
September 2014
Norton Solar 3.46 MWDC Solar Project

Norton Solar is a 3.46 MWDC fixed ground-mount solar project. Located in Norton, Massachusetts. Ryan’s responsibilities comprised full procurement and construction of the entire system...

View Project
January 2013
Alpaugh & Alpaugh North: 92.6 MWDC

Project Overview ATI’s ground-mount single-axis tracking support structure on impact-driven steel piers Completed in 9 months Trina 280W, 285W, & 290W; and Canadian Solar 280W...

View Project
Copyright © 2024 © 2021 The Ryan Company, Inc. All Rights Reserved.
Back to Top