Home Projects

Vesper Energy
Hammersville, Ohio

See all Projects
Project Details

Completion Date: March 2024

Location: Hammersville, Ohio

Client: Vesper Energy
Allen, Texas

Nestlewood Solar Hammersville, Ohio
Description of Project

Engineering, Procurement and Construction of an 80MWac/106.8MWdc Solar, 69kV/34.5kV Substation and 69kV Switching Station.

Scope includes installation of 540W PV modules, support structures, tracker racking system; DC-AC power conversion equipment; DC and AC equipment, enclosures and protective devices; system control, data acquisition and monitoring system; meteorological equipment; revenue meters; electrical service interconnection; security fences, safety barriers and signage, 66kV PV collector substation and 66kV 3-ring bus switchyard, and all other materials

Related Projects

2024 -2025
Cherrywood Solar
Caroline County, Maryland

Engineering, Procurement and Construction of a 145MWac/203MWdc Solar Project. Scope includes installation of 600W PV modules, support structures, tracker racking system; DC-AC power conversion equipment;...

View Project
December 2024
Fairfield 13.44MWdc Solar
Freestone County, Texas

Engineering, Procurement and Construction of a 9.95MWac/13.44MWdc Solar Project. Scope includes installation of 685W-695W PV modules, support structures, tracker system; DC-AC power conversion equipment; DC...

View Project
2023
Grizzly Ridge Solar I
Hamilton County, Texas

Engineering, Procurement and Construction of a 100MWac/131.67MWdc Solar Project. Scope includes installation of 540W PV modules, support structures, tracker racking system; DC-AC power conversion equipment;...

View Project
Copyright © 2025 The Ryan Company, Inc. All Rights Reserved.
Back to Top