AVI Energy
Freestone County, Texas

See all Projects
Project Details

Completion Date: December 2024

Location: Freestone County, Texas

Client: Dashiell Corporation
Houston, Texas

Fairfield 13.44MWdc Solar
Freestone County, Texas
Description of Project

Engineering, Procurement and Construction of a 9.95MWac/13.44MWdc Solar Project.

Scope includes installation of 685W-695W PV modules, support structures, tracker system; DC-AC power conversion equipment; DC and AC equipment , enclosures and protective devices; system control, data acquisition and monitoring system; meteorological equipment; revenue meters; electrical service interconnection; security fences, safety barriers and signage, and all other materials

Related Projects

2024 -2025
Cherrywood Solar
Caroline County, Maryland

Engineering, Procurement and Construction of a 145MWac/203MWdc Solar Project. Scope includes installation of 600W PV modules, support structures, tracker racking system; DC-AC power conversion equipment;...

View Project
March 2024
Nestlewood Solar
Hammersville, Ohio

Engineering, Procurement and Construction of an 80MWac/106.8MWdc Solar, 69kV/34.5kV Substation and 69kV Switching Station. Scope includes installation of 540W PV modules, support structures, tracker racking...

View Project
2023
Grizzly Ridge Solar I
Hamilton County, Texas

Engineering, Procurement and Construction of a 100MWac/131.67MWdc Solar Project. Scope includes installation of 540W PV modules, support structures, tracker racking system; DC-AC power conversion equipment;...

View Project