Engineering, Procurement and Construction of a 145MWac/203MWdc Solar Project.
Scope includes installation of 600W PV modules, support structures, tracker racking system; DC-AC power conversion equipment; DC and AC equipment, enclosures and protective devices; system control, data acquisition and monitoring system; meteorological equipment; revenue meters; electrical service interconnection; security fences, safety barriers and signage, and all other materials
Engineering, Procurement and Construction of a 9.95MWac/13.44MWdc Solar Project.
Scope includes installation of 685W-695W PV modules, support structures, tracker system; DC-AC power conversion equipment; DC and AC equipment , enclosures and protective devices; system control, data acquisition and monitoring system; meteorological equipment; revenue meters; electrical service interconnection; security fences, safety barriers and signage, and all other materials
Engineering, Procurement and Construction of an 80MWac/106.8MWdc Solar, 69kV/34.5kV Substation and 69kV Switching Station.
Scope includes installation of 540W PV modules, support structures, tracker racking system; DC-AC power conversion equipment; DC and AC equipment, enclosures and protective devices; system control, data acquisition and monitoring system; meteorological equipment; revenue meters; electrical service interconnection; security fences, safety barriers and signage, 66kV PV collector substation and 66kV 3-ring bus switchyard, and all other materials
Engineering, Procurement and Construction of a 100MWac/131.67MWdc Solar Project.
Scope includes installation of 540W PV modules, support structures, tracker racking system; DC-AC power conversion equipment; DC and AC equipment , enclosures and protective devices; system control, data acquisition and monitoring system; meteorological equipment; revenue meters; electrical service interconnection; security fences, safety barriers and signage, and all other materials
Construction of Shore-to Ship Power Project at Pier T, Berths T132-T140
Approximate Contract Value – $25 million
Scope of Service
The Work includes, but is not limited to, the following items:
Construction of 25 kV switchgear adjacent to existing switchgear at the
Main Terminal Substation (“MTS”).
Construction of Shore-to-Ship Power (“SSP”) Substations SSP 1, SSP2, SSP3 and SSP4.
Construction of Shore to Ship Power Outlets SPO-I, SPO-2, SPO-3, SPO-4, SPO-5, SPO-6, SPO-7, SPO-8, SPO-9, SPO-to, and SPO-ll, including wharf modifications for vaults.
Construction of equipment pads.
Earthwork, including excavation, bedding, filling, grading and segregate, test, reuse and dispose of excavated soil
Installation of crushed miscellaneous base and asphalt concrete pavement.
Demolition of existing paving, fencing and bollards.
Construction of paving, fencing and bollards, including footings.
Construction of duct banks, manholes and pull boxes.
Construction of conduit systems, including supports, under the existing
Construction of existing slurry and cut-off wall penetrations.
Installation of conductors in existing and new duct bank systems.
Installation and interconnections of new fiber optic cables for Power Logic
Communications between SSP substations, MTS switchgear and
Engineering, Procurement and Construction of a 126MWac/168MWdc Solar Project.
Scope includes installation of 415W PV modules, support structures, tracker racking system; DC-AC power conversion equipment; DC and AC equipment , enclosures and protective devices; system control, data acquisition and monitoring system; meteorological equipment; revenue meters; electrical service interconnection; security fences, safety barriers and signage, and all other materials.
Corcoran Solar Project is a 28.3 MWDC solar photovoltaic, grid-connected power generation facility located in Corcoran, California. Constructed for Consolidated Edison Development (CED). Immediately adjacent to Corcoran Solar Project, also completed for CED in 2013. All power was sold to Pacific Gas & Electric (PG&E). The site spans over 114 acres and will produce enough power to serve roughly 16,000 homes annually. This project was completed in 9 months: April 2014 to April 2015.
Ryan’s responsibilities comprised full engineering, procurement and construction of the entire system including procurement of electrical equipment, preparation of the site involving management of all project grading and trenching. Ryan also installed the support structures, module racking system, modules, inverters, DC wiring, AC power cables, with the associated collection equipment and all electrical systems for the entire project involving module connections and inverter installation. The Ryan team designed and optimized the project processes, installation and the 34.5kV-11.5Kv substation.
Project Overview
Completed in 9 months: August 2014 to April 2015
ATI’s ground-mount single-axis tracking support structure on impact-driven steel piers
SMA 1.8MWAC inverters
Canadian Solar 300W and Trina 305W modules
PLA with IBEW
Constructed for Consolidated Edison Development (CED)
Immediately adjacent to Corcoran Solar Project, also completed for CED in 2013
Norton Solar is a 3.46 MWDC fixed ground-mount solar project. Located in Norton, Massachusetts.
Ryan’s responsibilities comprised full procurement and construction of the entire system including procurement of electrical equipment, preparation of the site involving management of all project grading and trenching. Ryan also installed the support structures, module racking system, modules, inverters, DC wiring, AC power cables, with the associated collection equipment and all electrical systems for the entire project involving module connections, inverter installation, and 13.8kV interconnect install.
Project Overview
330W modules
(4) SMA 750kW inverters
Fixed ground-mount support structure on Sunlink ground screws