Colebrook South 5 MWAC
Wind Turbine System

Connecticut’s First Commercial Wind Farm
Project Overview
  • (2) General Electric 2.85- 103 turbines
  • 5KVA 240/120 Transformer
  • Completed in eight months
Scope of Services
  • Full engineering, procurement, and construction (EPC) of entire system
  • Provided and performed project engineering and design
  • Provided and installed civil and site work
  • Provided and installed erosion, sedimentation control and drainage
  • Provided and installed turbine foundations
  • Provided and installed electrical collection substation

BNE Energy, Inc.
Colebrook, Connecticut

Colebrook South Wind Turbine System
Colebrook, Connecticut
Description of Project

Engineering, Procurement and Construction of a 5MW Wind Turbine System consisting of 2 EA. GE 2.85-103 Turbines and 5KVA 240/120 transformer. Construction of Electrical Collection Substation including 5KVA 240/120 Transformer, 200A Disconnect Switch and MV Switchgear lineup. Scope also included associated site work, access roads, erosion, sedimentation control, drainage, pads and trenches, laydown areas, and turbine foundations.