Engineering, Procurement and Construction of a 5MW Wind Turbine System consisting of 2 EA. GE 2.85-103 Turbines and 5KVA 240/120 transformer. Construction of Electrical Collection Substation including 5KVA 240/120 Transformer, 200A Disconnect Switch and MV Switchgear lineup. Scope also included associated site work, access roads, erosion, sedimentation control, drainage, pads and trenches, laydown areas, and turbine foundations.