BNE Energy, Inc.
Colebrook, Connecticut

See all Projects
Project Details

Completion Date: 2015

Location: Colebrook, Connecticut

Client: BNE Energy, Inc.
West Hartford, Connecticut

Colebrook South Wind Turbine System
Colebrook, Connecticut
Description of Project

Engineering, Procurement and Construction of a 5MW Wind Turbine System consisting of 2 EA. GE 2.85-103 Turbines and 5KVA 240/120 transformer. Construction of Electrical Collection Substation including 5KVA 240/120 Transformer, 200A Disconnect Switch and MV Switchgear lineup. Scope also included associated site work, access roads, erosion, sedimentation control, drainage, pads and trenches, laydown areas, and turbine foundations.

Related Projects

November 2015
Colebrook South 5 MWAC
Wind Turbine System

Project Overview (2) General Electric 2.85- 103 turbines 5KVA 240/120 Transformer Completed in eight months Scope of Services Full engineering, procurement, and construction (EPC) of...