White River 2 Solar Project: 26.6 MWDC

The site spans over 140 acres and will produce enough power to serve roughly 16,000 homes annually.

White River 2 Solar project is a 26.6MWDC solar photovoltaic, grid connected power generation facility. This project was completed in 10 months.

Ryan’s responsibilities comprised full engineering, procurement and construction of the entire system including procurement of electrical equipment, preparation of the site involving management of all project grading and trenching. Ryan also installed the support structures, module racking system, modules, inverters, DC wiring, AC power cables, with the associated collection equipment and all electrical systems for the entire project involving module connections and inverter installation. The Ryan team designed and optimized the project processes, installation and the 34.5kV-11.5Kv substation.

Project Overview
  • ATI’s ground-mount single-axis tracking support structure on impact-driven steel piers
  • PLAs with IBEW and Ironworkers
  • Quanta successfully managed and worked around Swainson Hawk nesting zones during construction
  • Yingli 300W polycrystalline modules
  • GE Brilliance 1.05MW inverters
  • Constructed for Consolidated Edison Development (CED)
  • All power sold to Pacific Gas & Electric (PG&E)
  • Quanta Subsidiaries involved:
    • Dashiell Corporation
    • Intermountain Electric, Inc.

Corcoran 2 Solar Project: 28.3 MWDC

Corcoran Solar Project is a 28.3 MWDC solar photovoltaic, grid connected power generation facility located in Corcoran, California. Constructed for Consolidated Edison Development (CED). Immediately adjacent to Corcoran Solar Project, also completed for CED in 2013. All power was sold to Pacific Gas & Electric (PG&E). The site spans over 114 acres and will produce enough power to serve roughly 16,000 homes annually. This project was completed in 9 months: April 2014 to April 2015.

Ryan’s responsibilities comprised full engineering, procurement and construction of the entire system including procurement of electrical equipment, preparation of the site involving management of all project grading and trenching. Ryan also installed the support structures, module racking system, modules, inverters, DC wiring, AC power cables, with the associated collection equipment and all electrical systems for the entire project involving module connections and inverter installation. The Ryan team designed and optimized the project processes, installation and the 34.5kV-11.5Kv substation.

Project Overview

  • Completed in 9 months: August 2014 to April 2015
  • ATI’s ground-mount single-axis tracking support structure on impact driven steel piers
  • SMA 1.8MWAC inverters
  • Canadian Solar 300W and Trina 305W modules
  • PLA with IBEW
  • Constructed for Consolidated Edison Development (CED)
  • Immediately adjacent to Corcoran Solar Project, also completed for CED in 2013
  • All power sold to Pacific Gas & Electric (PG&E
  • Located in Corcoran, California
  • Quanta Subsidiaries involved:
    • Intermountain Electric, Inc.
    •  Dashiell Corporation

Syncarpha Portfolio: 7.2 MWDC

  • Portfolio represents a total of 7.2 MWDC ground mount at three different locations in Berkshire County, MA
  • Project List for Syncarpha Portfolio
      • Hancock I
      • Hancock II
      • Hancock III
  • Full engineering, procurement and construction
  • 335W Trina modules
  • (82) 60kW SMA Sunny Tripower inverters, (4) 20kW SMA Sunny Tripower inverters
  • Terra Smart racking