Home Projects

California State University, Fresno, CA

See all Projects
Project Details

Completion Date: September 2016

Location: Fresno, CA

Client: California State University

Electrical Infrastructure Upgrade Project

Project Overview

  • Construction of New 12 kV Switchgear Building including switchgear, cable vaults, incoming PG&E service conduits, manhole and interrupter switch, 12 kV loop feeder distribution control system and campus power monitoring system
  • 12 kV loop feeder distribution system comprised of four feeder loops as follows:
    • Feeder Loop 1- Feeds 26 facilities on West side of campus
    • Feeder Loop 2 – Feeds 17 facilities in the Central/ South sides of the campus
    • Feeder Loop 3 – Feeds 24 facilities on the North/East sides of the campus
    • Feeder Loop 4 – Feeds Central Plant and the new switchgear building on the North side of the campus
  • Building incoming low voltage service feeders, switchboards and power meters. Includes connecting the power meters to the local building IDF for connection to the new campus power monitoring system
  • Underground PG&E infrastructure between Cedar and Chestnut Avenues located on the North side of Barstow Avenue as part of the PG&E Rule 20 design project to underground the existing overhead 12 kV pole line as part of a street widening project to add a bicycle lane in the future
  • The design includes equipment pads on grade for transformers and capacitors

Related Projects

December 2017
Revelle Electrical Switch Station Expansion

Project Overview Utility infrastructure improvement for a large operational campus. Approximate Contract Value - $11 million ​Scope of Service Build a structure/facility for major utilities...

View Project
December 2015
Pier T – Shore to Ship Power Project

Project Overview Construction of Shore-to Ship Power Project at Pier T, Berths T132-T140 Approximate Contract Value - $25 million Scope of Service The Work includes,...

View Project
April 2010
Water Purification Plant Service Entrance Upgrade

Project Overview Construction of the Kern County Water Agency Improvements to District No. 4 Henry C. Garnett Water Purification Plant Service Entrance Approximate Contract Value...

View Project
Copyright © 2024 © 2021 The Ryan Company, Inc. All Rights Reserved.
Back to Top