Colebrook South 5 MWAC Wind Turbine System

Connecticut's First Commercial Wind Farm

 

Project Overview

  • (2) General Electric 2.85- 103 turbines

  • 5KVA 240/120 Transformer

  • Completed in eight months

  • Start Date: March 2015

  • Completion Date: November 2015

  • Located in Colebrook, Connecticut

  • Quanta Subsidiaries involved:
    - The Ryan Company, Inc.

 

Scope of Services

  • Full engineering, procurement, and construction (EPC) of entire system

  • Provided and preformed project engineering and design

  • Provided and installed civil and site work

  • Provided and installed erosion, sedimentation control and drainage

  • Provided and installed turbine foundations

  • Provided and installed electrical collection substation

Wind

Projects:

 

Connecticut’s First Commercial Wind Farm. Located in Colebrook, Connecticut. The Ryan Company provided full engineering, procurement, and construction (EPC) of the entire system. Ryan provided and preformed project engineering, and design. Ryan was also provided and installed civil and site work, including erosion, sedimentation control, drainage, turbine foundations, and electrical collection substation.