Project Overview
- (2) General Electric 2.85- 103 turbines
- 5KVA 240/120 Transformer
- Completed in eight months
Scope of Services
- Full engineering, procurement, and construction (EPC) of entire system
- Provided and performed project engineering and design
- Provided and installed civil and site work
- Provided and installed erosion, sedimentation control and drainage
- Provided and installed turbine foundations
- Provided and installed electrical collection substation