The ConEdison Development Portfolio represents a combined 150MW at six different locations in the Central Valley of California. Some 1000 acres will have been converted into solar photovoltaic facilities by final commissioning in Q4 of 2016.
As the EPC of record for these projects, The Ryan Company oversees the full engineering and construction of the system including: engineering and construction of the entire system including procurement of electrical equipment, structural supports and preparation of the site, including management of all project grading and trenching. Ryan also installed the support structures, module racking system, modules, inverters, DC wiring, power cables with the associated collection equipment, and all electrical systems for the entire project involving module connections and inverter installation. The Ryan team designed and optimized the project processes, installation and the 34.5-11.5kV substation interconnection.
Norton Solar is a 3.46 MWDC fixed ground-mount solar project. Located in Norton, Massachusetts.
Ryan’s responsibilities comprised full procurement and construction of the entire system including procurement of electrical equipment, preparation of the site involving management of all project grading and trenching. Ryan also installed the support structures, module racking system, modules, inverters, DC wiring, AC power cables, with the associated collection equipment and all electrical systems for the entire project involving module connections, inverter installation, and 13.8kV interconnect install.
Project Overview
330W modules
(4) SMA 750kW inverters
Fixed ground-mount support structure on Sunlink ground screws
NJ Oak Solar was constructed on a 101-acre site and connects to Atlantic City Electric’s distribution system. The project involved the removal of the dense brush and trees on site. At the time of completion, the project was the largest non-utility owned project east of the Mississippi and produced enough power to support 8,250 homes.
Ryan’s responsibilities comprised full engineering, procurement and construction of the entire system including procurement of electrical equipment, preparation of the site involving management of all project grading and trenching. Ryan also installed the support structures, module racking system, modules, inverters, DC wiring, power cables, with the associated collection equipment and all electrical systems for the entire project involving module connections and inverter installation. The Ryan team designed and optimized the project processes, installation and the 12.47kV switchyard.
Project Overview
Yingli 235W polycrystalline modules
Satcon 1 MW inverters
Completed in 8 months: April 2011 to December 2011
Fixed ground-mount support structure on impact-driven steel piers
Significant challenges included a hurricane, an early snowstorm and a 5.8 magnitude earthquake
Ryan’s responsibilities comprised full procurement and construction of the entire system including procurement of electrical equipment, preparation of the site involving management of all project grading and trenching. Ryan also installed the support structures, module racking system, modules, inverters, DC wiring, AC power cables, with the associated collection equipment and all electrical systems for the entire project involving module connections and inverter installation.
Project Overview
1.60 MWDC ground-mount project
325W modules
(1) 750kW inverter, (1) 500kW inverter
Completed in three months
Fixed ground-mount support structure on ground screws
White River Solar project is a 25.2MWDC solar photovoltaic, grid connected power generation facility.
Ryan’s responsibilities comprised full engineering, procurement and construction of the entire system including procurement of electrical equipment, preparation of the site involving management of all project grading and trenching. Ryan also installed the support structures, module racking system, modules, inverters, DC wiring, AC power cables, with the associated collection equipment and all electrical systems for the entire project involving module connections and inverter installation. The Ryan team designed and optimized the project processes, installation and the 34.5kV-11.5Kv substation.
Project Overview
Completed in 8 months
ATI’s ground-mount single-axis tracking support structure on impact driven steel piers
Emerson 1.06MW inverters
Yingli 300W & Canadian Solar 290W polycrystalline modules
Corcoran Solar Project is a 25.7 MWDC solar photovoltaic, grid connected power generation facility. This project was completed in 8 months.
Ryan’s responsibilities comprised full engineering, procurement and construction of the entire system including procurement of electrical equipment, preparation of the site involving management of all project grading and trenching. Ryan also installed the support structures, module racking system, modules, inverters, DC wiring, AC power cables, with the associated collection equipment and all electrical systems for the entire project involving module connections and inverter installation. The Ryan team designed and optimized the project processes, installation and the 34.5kV-11.5Kv substation.
Project Overview
ATI’s ground-mount single-axis tracking support structure on impact-driven steel piers
PLA with IBEW
Yingli 295W & 300W and Canadian Solar 290W polycrystalline modules
Emerson 1.06MW inverters
All power sold to Southern California Edison (SCE)
White River 2 Solar project is a 26.6MWDC solar photovoltaic, grid connected power generation facility. This project was completed in 10 months.
Ryan’s responsibilities comprised full engineering, procurement and construction of the entire system including procurement of electrical equipment, preparation of the site involving management of all project grading and trenching. Ryan also installed the support structures, module racking system, modules, inverters, DC wiring, AC power cables, with the associated collection equipment and all electrical systems for the entire project involving module connections and inverter installation. The Ryan team designed and optimized the project processes, installation and the 34.5kV-11.5Kv substation.
Project Overview
ATI’s ground-mount single-axis tracking support structure on impact-driven steel piers
PLAs with IBEW and Ironworkers
Quanta successfully managed and worked around Swainson Hawk nesting zones during construction
Yingli 300W polycrystalline modules
GE Brilliance 1.05MW inverters
Constructed for Consolidated Edison Development (CED)