Alpaugh & Alpaugh North: 92.6 MWDC

These 2 Projects cover more than 650 acres and produce enough power to serve roughly 58,000 homes.
Project Overview
  • ATI’s ground-mount single-axis tracking support structure on impact-driven steel piers
  • Completed in 9 months
  • Trina 280W, 285W, & 290W; and Canadian Solar 280W & 285W polycrystalline modules
  • Emerson 1.25 MW inverters
  • Constructed for GCL Solar Energy, then acquired by Consolidated Edison Development
  • All power sold to Pacific Gas & Electric
  • Quanta Subsidiaries involved:
    • Dashiell Corporation
    • Manuel Brothers
    • PAR Electric Company
Scope of Services
  • Full engineering, procurement, and construction (EPC) of entire system, with installation of The Ryan Company, Inc. provided modules
  • Preparation of site – management of all project grading, trenching and fencing
  • Installation of the support structures and module racking system
  • Installation of the modules, inverters, DC wiring, AC power cables and the associated collection equipment
  • Procurement of all equipment
  • Design and optimization of project processes and installation
  • Design and installation of the 34.5-115kV substation

NJ Oak Solar Project: 12.9 MWDC

NJ Oak Solar was constructed on a 101-acre site and connects to Atlantic City Electric’s distribution system. The project involved the removal of the dense brush and trees on site. At the time of completion, the project was the largest non-utility owned project east of the Mississippi and produced enough power to support 8,250 homes.

Ryan’s responsibilities comprised full engineering, procurement and construction of the entire system including procurement of electrical equipment, preparation of the site involving management of all project grading and trenching. Ryan also installed the support structures, module racking system, modules, inverters, DC wiring, power cables, with the associated collection equipment and all electrical systems for the entire project involving module connections and inverter installation. The Ryan team designed and optimized the project processes, installation and the 12.47kV switchyard.

Project Overview
  • Yingli 235W polycrystalline modules
  • Satcon 1 MW inverters
  • Completed in 8 months: April 2011 to December 2011
  • Fixed ground-mount support structure on impact-driven steel piers
  • Significant challenges included a hurricane, an early snowstorm and a 5.8 magnitude earthquake
  • All power sold to Atlantic City Electric

Avenal Solar Projects: 57.7 MWDC

Comprised of 3 projects: Sun City 25.651MWDC, San Drag- 24.369MWDC and Avenal Park- 7.695 MWDC

Project Overview
  • Sharp 128W thin-film frameless modules
  • Emerson 1 MW inverters
  • Completed in 10 months
  • Fixed ground-mount support structure on impact-driven steel piers
  • Constructed concurrently for Eurus Energy Holdings and NRG Solar
  • All power sold to Pacific Gas & Electric
  • Quanta Subsidiaries involved:
    • Dashiell Corporation
    • PAR Electric Company
Scope of Services
  • Full engineering, procurement, and construction (EPC) of entire system
  • Preparation of site – management of all project grading, trenching and fencing
  • Installation of the support structures and module racking system
  • Installation of the modules, inverters, DC wiring, AC power cables and the associated collection equipment
  • Procurement of all equipment
  • Design and optimization of project processes and installation
  • Design and installation of the 34.5kV substation

Colebrook South 5 MWAC Wind Turbine System

Connecticut’s First Commercial Wind Farm
Project Overview
  • (2) General Electric 2.85- 103 turbines
  • 5KVA 240/120 Transformer
  • Completed in eight months
Scope of Services
  • Full engineering, procurement, and construction (EPC) of entire system
  • Provided and performed project engineering and design
  • Provided and installed civil and site work
  • Provided and installed erosion, sedimentation control and drainage
  • Provided and installed turbine foundations
  • Provided and installed electrical collection substation

White River Solar Project: 25.2 MWDC

The site spans over 140 acres and will produce enough power to serve roughly 16,000 homes annually.

White River Solar project is a 25.2MWDC solar photovoltaic, grid connected power generation facility.

Ryan’s responsibilities comprised full engineering, procurement and construction of the entire system including procurement of electrical equipment, preparation of the site involving management of all project grading and trenching. Ryan also installed the support structures, module racking system, modules, inverters, DC wiring, AC power cables, with the associated collection equipment and all electrical systems for the entire project involving module connections and inverter installation. The Ryan team designed and optimized the project processes, installation and the 34.5kV-11.5Kv substation.

Project Overview
  • Completed in 8 months
  • ATI’s ground-mount single-axis tracking support structure on impact driven steel piers
  • Emerson 1.06MW inverters
  • Yingli 300W & Canadian Solar 290W polycrystalline modules
  • All power sold to Pacific Gas & Electric (PG&E)
  • Quanta Subsidiaries involved:
    • Dashiell Corporation

Corcoran Solar Project: 25.7 MWDC

The site spans over 115 acres and will produce enough power to serve roughly 16,000 homes annually.

Corcoran Solar Project is a 25.7 MWDC solar photovoltaic, grid connected power generation facility. This project was completed in 8 months.

Ryan’s responsibilities comprised full engineering, procurement and construction of the entire system including procurement of electrical equipment, preparation of the site involving management of all project grading and trenching. Ryan also installed the support structures, module racking system, modules, inverters, DC wiring, AC power cables, with the associated collection equipment and all electrical systems for the entire project involving module connections and inverter installation. The Ryan team designed and optimized the project processes, installation and the 34.5kV-11.5Kv substation.

Project Overview

  • ATI’s ground-mount single-axis tracking support structure on impact-driven steel piers
  • PLA with IBEW
  • Yingli 295W & 300W and Canadian Solar 290W polycrystalline modules
  • Emerson 1.06MW inverters
  • All power sold to Southern California Edison (SCE)
  • Quanta Subsidiaries involved:
    • Intermountain Electric, Inc.
    • Dashiell Corporation

White River 2 Solar Project: 26.6 MWDC

The site spans over 140 acres and will produce enough power to serve roughly 16,000 homes annually.

White River 2 Solar project is a 26.6MWDC solar photovoltaic, grid connected power generation facility. This project was completed in 10 months.

Ryan’s responsibilities comprised full engineering, procurement and construction of the entire system including procurement of electrical equipment, preparation of the site involving management of all project grading and trenching. Ryan also installed the support structures, module racking system, modules, inverters, DC wiring, AC power cables, with the associated collection equipment and all electrical systems for the entire project involving module connections and inverter installation. The Ryan team designed and optimized the project processes, installation and the 34.5kV-11.5Kv substation.

Project Overview
  • ATI’s ground-mount single-axis tracking support structure on impact-driven steel piers
  • PLAs with IBEW and Ironworkers
  • Quanta successfully managed and worked around Swainson Hawk nesting zones during construction
  • Yingli 300W polycrystalline modules
  • GE Brilliance 1.05MW inverters
  • Constructed for Consolidated Edison Development (CED)
  • All power sold to Pacific Gas & Electric (PG&E)
  • Quanta Subsidiaries involved:
    • Dashiell Corporation
    • Intermountain Electric, Inc.

Corcoran 2 Solar Project: 28.3 MWDC

Corcoran Solar Project is a 28.3 MWDC solar photovoltaic, grid connected power generation facility located in Corcoran, California. Constructed for Consolidated Edison Development (CED). Immediately adjacent to Corcoran Solar Project, also completed for CED in 2013. All power was sold to Pacific Gas & Electric (PG&E). The site spans over 114 acres and will produce enough power to serve roughly 16,000 homes annually. This project was completed in 9 months: April 2014 to April 2015.

Ryan’s responsibilities comprised full engineering, procurement and construction of the entire system including procurement of electrical equipment, preparation of the site involving management of all project grading and trenching. Ryan also installed the support structures, module racking system, modules, inverters, DC wiring, AC power cables, with the associated collection equipment and all electrical systems for the entire project involving module connections and inverter installation. The Ryan team designed and optimized the project processes, installation and the 34.5kV-11.5Kv substation.

Project Overview

  • Completed in 9 months: August 2014 to April 2015
  • ATI’s ground-mount single-axis tracking support structure on impact driven steel piers
  • SMA 1.8MWAC inverters
  • Canadian Solar 300W and Trina 305W modules
  • PLA with IBEW
  • Constructed for Consolidated Edison Development (CED)
  • Immediately adjacent to Corcoran Solar Project, also completed for CED in 2013
  • All power sold to Pacific Gas & Electric (PG&E
  • Located in Corcoran, California
  • Quanta Subsidiaries involved:
    • Intermountain Electric, Inc.
    •  Dashiell Corporation

Syncarpha Portfolio: 7.2 MWDC

  • Portfolio represents a total of 7.2 MWDC ground mount at three different locations in Berkshire County, MA
  • Project List for Syncarpha Portfolio
      • Hancock I
      • Hancock II
      • Hancock III
  • Full engineering, procurement and construction
  • 335W Trina modules
  • (82) 60kW SMA Sunny Tripower inverters, (4) 20kW SMA Sunny Tripower inverters
  • Terra Smart racking