Project Highlights

Sun City, Sand Drag and Avenal Park:  Avenal, CA

     45 MWac Solar Project

Project Overview

  • 45 MW Solar Plant – upon completion, will be the largest PV generating facility in California
  • Will generate enough power for 36,000 homes
  • 450,900 SHARP 128W thin-film modules,45 inverters
  • Fixed ground-mount support structure, impact-driven steel piers
  • Three 70-34.5kV substations
  • Start of Construction:  September 2010   Anticipated Completion: Mid 2011
  • Utility Offtaker –  Pacific Gas & Electric (a 20 year power purchase agreement was approved)

Responsibilities

  • Preparation of site – site clearing, dust control, environmental protection, and perimeter fence
  • Procurement of all materials
  • Construction and installation of the complete solar structure, including steel erection for the fixed arrays
  • Electric interconnection – installation of the inverters and the associated collection equipment
  • Engineering and overall project management –  optimization of project design and process within given parameters
  • Design and construction of substations performed by a Quanta Subsidiary: Dashiell
  • Overall Project Management

Press Releases

Sharp Signs Contract for 58 MW (DC) Photovoltaic Solar Power Project
http://optics.org/press/215

Eurus Energy and NRG Solar Partner to Build California's Largest Solar Photovoltaic Generating Facility
http://eurusenergy.com/news/press-releases/eurus-energy-america/avenal-solar-project-financing/

Ohio State University, Columbus, Ohio (Phase 2)

High Voltage Switch and Cable Replacement

Project Overview

  • Electrical Infrastructure replacements for the campus

Responsibilities

  • Ryan was the prime contractor and electrical contractor
  • Preparation of site – performed  all project excavation, grading, and trenching
  • Installation of owner supplied switches and corresponding duct, cable, and terminations for provided switches in various locations throughout campus
  • Performed concrete flatwork and installed concrete and masonry walls
  • Maintained safety and control of locations at high traffic areas

Lincoln Renewable Energy

10 MW AC Solar Project

Project Overview

  • 10MW, ground-mounted, fixed rack photovoltaic system
  • 7 month construction schedule
  • Over 50,000 panels
  • Installation of piers, 15kV switchgear, meteorological stations, SCADA, and fiber optic cable
  • Clearing and grubbing job site

Responsibilities

  • Preparation of site – site clearing, dust control, environmental protection, and perimeter fence
  • Procurement of all materials
  • Construction and installation of the complete solar structure, including steel erection for the fixed arrays
  • Electric interconnection – installation of the inverters and the associated collection equipment
  • Engineering and overall project management –  optimization of project design and process within given parameters
  • Overall Project Management

Sempra Generation: Boulder City, Nevada

      El Dorado 10 MWac Solar Project

Project Overview

  • 10 MW Solar Plant on over 88 acres will produce 17.5 million kWh annually
  • 168,400 First Solar thin-film modules,10 inverters
  • Fixed ground-mount support structure, impact-driven steel piers
  • Completed in 6 months, 2008
  • Utility Offtaker –  Pacific Gas & Electric

Responsibilities

  • Preparation of site – site clearing, dust control, environmental protection, and perimeter fence
  • Construction and installation of the complete solar structure, including steel erection for the fixed arrays as well as precast houses for the site electronic equipment
  • Electric interconnection – installation of the inverters and the associated collection equipment
  • Engineering and overall project management –  optimization of project design and process within given parameters

Cleantech: Mendota, California

CalRENEW 5 MWac Solar Project

Project Overview

  • 5 MW Solar Plant located on over 50 acres
  • 50,040 Sharp 121 Watt  and 128 Watt thin-film modules
  • 5 Satcon 1 MW inverters
  • Fixed ground-mount support structure on impact-driven steel piers
  • Completed in 4 months, 2009.

Responsibilities

  • Preparation of site – management of  all project grading and trenching
  • Installation of the support structures and module racking
  • Installation of the modules, inverters, DC wiring, power cables, and the associated collection equipment
  • Installation of  all electrical systems for the entire project: module connections, inverter installation,  and duct banks
  • Procurement of electrical equipment
  • Design and optimization of project processes and installation
  • Design and installation of the 70 kV Substation

SunEdison: Lexington, North Carolina

     Davidson County 15MWac Solar Project
     Phase 1 Completed 3.5MWac

Project Overview

  • 15MWac Solar Plant on a  Wattsun single-axis tracking system
  • 63,360 Suntech 280 watt modules
  • 30 Satcon 500kW PowerGate Plus inverters
  • Support structure  vibratory-driven steel piers
  • Phase 1 completed in  4 months, 2009
  • Utility Offtaker – Duke Energy

Responsibilities

  • Preparation of site – management of  all project grading, trenching and access roads
  • Management of  the installation of the array support structures
  • Installation of the Wattsun single-axis tracking system, electric drive motors and framework for the supports of the modules
  • Installation of all electrical systems for the entire project: module connections, inverter installation, power cables, conduit, wiring and associated collection equipment
  • Overall project management  – optimization of project design and installation process

SunEdison: Hagerstown, MD

     Solar Electric System at Staples 500 kWac

Project Overview

  • 500 kWac fixed ground-mount system
  • 9120 First Solar 70 watt modules
  • 1 Satcon 500 kW inverter
  • Project was completed in 3 months

Responsibilities

  • Preparation of site – management of all project grading and trenching
  • Construction and installation of the support structure and module racking system
  • Installation of all electrical systems for the entire project: module connections, inverter installation, and duct banks
  • Installation of modules, galvanized steel racking, inverters, tracker support columns
  • Installation of DC wiring, power cables, and the associated collection of equipment
  • Procurement of all electrical equipment

SunEdison: Hanover, MD

     Solar Electric System at Staples 826 kWac

Project Overview

  • 1 MWdc roof-mount system
  • 3,345 Evergreen 180 watt modules
  • 2,100 Evergreen 190 watt modules
  • 1 Satcon 500 kW inverter
  • Project was completed in 3 months

Responsibilities

  • Construction and installation of the support structure and module racking system
  • Installation of all electrical systems for the entire project: module connections, inverter installation, and duct banks
  • Installation of modules, galvanized steel racking, inverters, tracker support columns
  • Procurement of all electrical equipment

SunEdison: Fairfield, CA

     Solar Electric System at Fairfield Sewer District 1.14 MWac

Project Overview

  • 1.14 MWac ground-mount, single axis tracker system
  • 6,528 Yingli 175 watt moduels
  • 2 Solaron 500 kW inverters

Responsibilities

  • Construction and installation of the support structure and module racking system
  • Installation of solar modules, inverters, DC wiring, and power cabling
  • Installation of underground distribution
  • Procurement of all electrical equipment

Metropolitan Washington Airport Authority, Chantilly, VA

     Dulles Stallion Branch Sanitary Trunk Line Project

Project Overview

  • 3 miles of sanitary sewer force main, which included  one 4" and one 12" ductile iron pipe
  • Two associated lift stations
  • New electrical duct bank
  • The gravity sanitary sewer system was installed to reroute the sewer flow to the new Cub Run Lift Station
  • Completed in 2007

Ryan's Responsibilities

  • Ryan was the prime contractor and electrical contractor
  • Preparation of site – management of  all project grading and trenching
  • Construction of the new Cub Run Lift Station, a new Taxiway Q Booster Station, and valve vault
  • Installation of approximately 2.4 miles of electrical duct bank consisting of two 6" 6 way parallel duct banks;  49 precast electrical manholes and 28 sewer manholes; 
  • Installation of 34.5kV cable through the new duct and manhole system; 
  • Construction of cast-in-place transformer pads with containment; 
  • Installation of two 13.2 - 34.5kV transformers;  two 34.5kV circuits through the new duct bank system
  • SCADA system

Kern County Water Agency, Bakersfield, CA

    Water Purification Plant Service Entrance Upgrade

Project Overview

  • Construction of the Kern County Water Agency
  • Improvements to District No. 4 Henry C. Garnett Water Purification Plant Service Entrance
  • Completed in 2010

Ryan's Responsibilities

  • Ryan was the prime contractor and electrical contractor
  • Preparation of site – site clearing, dust control, environmental protection, and perimeter fence
  • Construction of a new 115kV to 4160v substation and service entrance building
  • Installation of a  4.16 kV electrical power distribution system comprised of remotely operated medium voltage switchgear
  • 2000kw Stand-by diesel engine generators
  • Installation of an automatic transfer control system
  • Providing all electrical raceways, including concrete encased underground ductbanks, cable tray and conduit, and conductors required to connect the following existing facilities:
    1. The transformer serving the existing Water Purification Plant (WPP)
    2. The 1000 kW solar photovoltaic system which will be furnished and installed under a separate contract
    3. The Northwest Pump Station

California State University, Monterey Bay, CA

    Campus Crescent Infrastructure Upgrade

Project Overview

  • Mechanical and Electrical Infrastructure upgrades for the complete campus
  • New hot water system to various buildings
  • Completion of the underground 15kV loop throughout the campus including medium voltage switchgear and transformers
  • Completed in 2007

Ryan's Responsibilities

  • Ryan was the prime contractor and electrical contractor
  • Preparation of site – performed  all project grading, trenching and access roads
  • Furnished and installed all mechanical and electrical infrastructure upgrades
  • Installation of underground medium voltage loop, switchgear and transformers

Ohio State University, Columbus, Ohio

     High Voltage Switch and Cable Replacement

Project Overview

  • Electrical Infrastructure replacements for the campus
  • Complete in 2010

Ryan's Responsibilities

  • Ryan was the prime contractor and electrical contractor
  • Preparation of site – performed  all project excavation, grading, and trenching
  • Installation of owner supplied switches and corresponding duct, cable, and terminations for provided switches in various locations throughout campus
  • Performed concrete flatwork and installed concrete and masonry walls
  • Maintained safety and control of locations at high traffic areas

US Army Corps of Engineers

     Exterior Electrical Distribution System Upgrade
     Lake City AAP, Missouri

Project Overview

  • Completion Date – October 1995

Ryan's Responsibilities
Phase A

  • Constructed (2) 69 kV /12.47 substations
  • Worked included site grading, foundations & electrical
  • Constructed 15 miles of new 15 kV overhead distribution lines
  • Constructed 10 miles of underground ductbank
  • Construction 8 backup power generation systems
  • Replaced (35) 5 kV load centers with new 15 kV equipment connected to industrial buildings
  • Installed 35 Automatic transfer switches and connected to existing industrial buildings.
  • Demolition of 10 miles of existing 5 kV OH distribution line
  • Demolition of existing 69 kV / 5 kV substation
  • New construction & conversion to new system was staged to keep Lake
  • City Army Ammunition fully operational during normal working hours

Phase B

  • Expanded (1) 69 kV / 12.47 kV substation
  • Including site grading, foundations, transformer, circuit breakers & busing
  • Installed 69 kV pilot wire relay between (2) substations
  • Installed 12 miles of 15 kV OH distribution lines

Ohio State University, Columbus, Ohio

     McCracken Power plant Emissions Compliance Construction

Project Overview

  • The electrical work included the replacement of an existing 15kV OSU Substation, installation of a new 15kV McCracken Substation and installation of all associated feeders to the newly installed boilers in the existing boiler house
  • Completion Date – January 2007

Ryan's Responsibilities

  • OSU Substation: Renovations of existing substation including installation of new medium voltage switchgear on the North and South side of the substation, battery system, reactors, cable trays and lighting
  • McCracken Substation: Construction of new McCracken Substation including installation of Medium Voltage Switchgear and Motor Control Centers, battery system, variable frequency drives, electrical installation of new electrical generators and synchronizing cubicles, ground resistors, heat trace system, transformers, and cable trays
  • McCracken Powerhouse: Renovations to provide pow`er to new boilers including the installation of new 480V Substations, medium voltage feeders through existing tunnels and conduit chase, demolition and conduit relocations